In eight steps to a house from containers
Short answer: The construction of a house from containers follows a clear process: first clarify building law and floor plan, then select provider, prepare foundation, have modules manufactured in the factory, set up by crane and finally complete connections and interior fit-out. For the module price calculate with approx. 1.500–2.600 €/m².
- Check location and building law: clarify development plan, area classification and permit obligation early with the building authority.
- Define floor plan and module grid: how many container modules next to each other or stacked result in the desired living area.
- Select provider and compare construction and performance description so it is clear which expansion stage is included.
- Prepare foundation: point, strip foundation or floor slab according to building ground and module weight.
- Have modules manufactured in the factory: insulation, windows, electrical and sanitary are installed in advance.
- Organize transport and crane: plan access road, positioning area and if necessary road closure for the delivery.
- Erection: The crane places the modules on the foundation, usually within a few days.
- Complete connections and interior fit-out: electricity, water, wastewater as well as the remaining fit-out work.
Cost items at a glance
The module price is only one part of the total costs. The following overview lists the most important items. Where no reliable project value is available, it explicitly says "TODO: Wert eintragen".
| Cost item | Guideline value | Note |
|---|---|---|
| Container / modules | ab 65.000 € gesamt bzw. 1.500–2.600 €/m² | Depending on fit-out stage and number of modules |
| Foundation | TODO: Wert eintragen | Point, strip foundation or floor slab according to subsoil |
| Transport | TODO: Wert eintragen | Depending on distance, module size and accessibility |
| Crane | TODO: Wert eintragen | Setting the modules, depending on crane class and duration |
| Connections | TODO: Wert eintragen | Electricity, water, wastewater and telecommunications |
| Interior fit-out | TODO: Wert eintragen | Depending on fit-out stage and own work |
The module values are from our price facts 2026. The remaining items depend heavily on the individual case and are therefore marked as "TODO: Wert eintragen". Detailed information can be found under Container house costs.
Read more
An overview of construction method, advantages and models is provided by the Container house overview. Read all cost items in detail under Container house costs, the legal requirements under Container house approval. How transport and crane interact on the erection day is shown on the page Erection and transport.
Compare offers for your house from containers
Tell us desired size, fit-out stage and region — we match with suitable providers and send you specific offers free of charge. Non-binding and quick.