Check prefabricated house construction description: minimum specifications, gaps and checklist

The service included in the prefabricated house price is determined by the construction description – anything missing will be charged additionally. This guide shows the minimum specifications according to Art. 249 EGBGB, how to compare the scope of services of several providers and uncover the typical gaps (earthworks, house connections, painting). With checklist and independent review.

Stand: 21. Juli 2026
Reading time: 10 min.

The construction description is the decisive document when purchasing a prefabricated house – more important than any glossy brochure. It specifies which service is included in the price and anything that is missing there will be charged later. Anyone who wants to check a prefabricated house construction description should know the statutory minimum requirements according to Article 249 EGBGB, compare the scope of services of several providers and specifically search for the typical gaps. This guide provides a systematic checklist for this – and shows where an independent review can be obtained. Who to build turnkey wants to, should pay particular attention to the scope of the interior finishing trades in the construction description.

Art. 249
EGBGB
Mandatory contents of the construction description
30–60
Number of pages
for reputable providers
8+
typical service gaps
from excavation to painting

Minimum requirements according to Art. 249 EGBGB

Short answer: Since the reform of the building contract law the contractor must hand over a construction description to the consumer prior to conclusion of the contract, the mandatory content of which is set out in Article 249 EGBGB It must clearly represent the essential characteristics of the house – type and scope of the services, building data, building construction, interior finishing, building technology, quality and energy standard as well as binding information on the completion date. If information is missing, any doubts in interpretation shall be at the expense of the contractor.

Important: The legal requirement prescribes what must be described – not how high-quality it is built. A provider fulfills Art. 249 EGBGB even with a favorable standard as long as it describes it clearly. The construction description is thus primarily a transparency instrument, not a quality promise. This is exactly the most common fallacy when buying a prefabricated house: Many interested parties equate a detailed, professionally appearing construction description with high building quality. In fact the extent of the document initially only says something about the diligence of the description. Whether the described standard matches your requirements you must judge position for position yourself – or have it judged. These details must at least be included in 2026:

  • General description of the building to be erected with floor plan, living area and room division.
  • Type and scope of the offered services as well as explicitly excluded services.
  • Building data, plans and information on building construction and building physics.
  • Description of the interior finishing and the building services (heating, sanitary, electrical, ventilation).
  • Information on the energy, fire protection and sound insulation standard.
  • Binding information on the time of completion.

For the formal framework of the contract itself – revocation, payment plan, 90% limit – additionally read the guide Check prefabricated house contract as well as the general principles under Check building contract. Where the construction description stands in the entire purchase process is shown by the guide Buy prefabricated house.

A second aspect is often overlooked: The construction description becomes a contractual component. What is stated in it is what the company is obligated to provide – and only that. Brochures, show home impressions or verbal assurances from the seller are legally worthless as long as they are not incorporated into the construction description or the contract. Therefore insist that every verbally promised service is taken over in writing into the construction description. An older, generally worded construction description that shifts many details to the later "measurement" or to the "selection process" shifts the cost risk to you – with a transparently formulated description on the other hand quantities, qualities and brands are already fixed.

Compare scope of services: Why identical framework conditions count

Short answer: Two construction descriptions are only comparable if the same framework conditions underlie them: same living area, same energy standard, same finishing level. Only then does the price have explanatory power. Therefore before the comparison determine which square meter figure, which KfW or GEG standard and which equipment level you desire – and request the construction descriptions of several providers according to exactly these specifications.

A common error is the comparison of final prices without regard to the scope of services. The cheaper provider can become more expensive as soon as the missing positions are purchased subsequently. Therefore compare in a structured manner:

Compare scope of services — often defined differently

PositionProvider often "included"Provider often "extra"
Floor slab / basementcalculated as optiononly house from upper edge of floor slab
Interior plaster / paintingprepared ready-to-paintBuilder-owner self-performance
Floor coveringsStandard selectionnot included at all
Sanitary fixturesStandard seriesonly connections set
Ventilation system (KWL)with heat recoverynot planned
Heating systemHeat pump incl. storageBasic variant without PV coupling
House connectionscoordinatedcompletely builder-owner matter

Prepare a simple table for the comparison: The trades are in the rows, the providers in the columns. This way you can see at a glance where one provider lists a position as included that another identifies as "by others" or "optional". Only this line-by-line comparison makes the final prices honestly comparable – and exposes seemingly cheap offers that are achieved through missing services. Pay particular attention to positions that do not appear in an offer at all: What is not mentioned is usually not calculated either.

Via our manufacturer comparison and the house catalogues you can request construction descriptions from several companies and lay them next to each other. We compare verifiable characteristics in doing so – without ranking, without test winner.

Request several construction descriptions for comparison

Request construction and performance descriptions from several manufacturers via our free comparison - with identical specifications. This allows you to recognize position for position which service is included in the price.

Typical gaps: earthworks, house connections, painting works

Short answer: The most expensive surprises almost always appear at the same places: earthworks and floor slab, house connections for electricity, water, sewage and telecom as well as interior plaster, painting and floor works. These positions are missing entirely in many prefabricated house construction descriptions or are only marked as “bauseits” - thus builder-owner responsibility. Expect 25.000 to 60.000 Euro in costs in 2026 that arise outside the pure house price.

Scan the construction description specifically for the words “bauseits”, “not included”, “optional” and “nach Aufwand”. The later additional claims are hidden in these places. The most common gaps 2026:

  1. 1.Earthworks, excavation and floor slab - often only as an option, with soil class reservation.
  2. 2.House connections (electricity, water, sewage, gas, telecom) - almost always bauseits.
  3. 3.Interior plaster and painting works - with “technikfertig” completely builder-owner responsibility.
  4. 4.Floor coverings - often not at all or only included in living areas.
  5. 5.Sanitary objects - partly only connections, WC/washbasin/shower extra.
  6. 6.External facilities, terrace, access, carport - virtually never in the house price.
  7. 7.Construction power, construction water, construction site setup and crane placement area.
  8. 8.Surveying, soil report and structural verification - ancillary costs outside the offer.

Signal word “bauseits”

“Bauseits zu erbringen” sounds harmless but means: You pay and organize this service yourself. Add all bauseits positions and the construction ancillary costs to the house price - only this sum shows your real budget. The guide provides an overview of all cost blocks House construction costs.

Material selection: When the standard becomes a cost trap

Short answer: The construction description names an equipment standard, the material selection implements it. It becomes critical when the construction description only names “standard selection according to material selection” without specifying makes, price groups and quantities. Then it only becomes apparent at the material selection table that popular tiles, floors or sanitary series fall into more expensive price groups - with additional payments of 15.000 to 40.000 Euro.

Therefore require that the construction description contains an equipment performance specification with specific makes, price groups and quantities - sockets per room, tile area, sanitary objects, interior doors. We treat the contractual side of the material selection in depth in the guide Check prefabricated house contract. Pay attention to:

  • Specific makes and price groups instead of “standard selection”.
  • Quantities: sockets and switches per room, number of bathrooms, interior doors.
  • Tile area and quality, floor covering per room type.
  • Sanitary objects including fittings with manufacturer specification.
  • Regulation whether unused material selection budget expires.

Read energy standard and house technology correctly

Short answer: The energy and technology part of the construction description determines comfort, operating costs and subsidy eligibility. Pay attention to specific U-values of the building components, the achieved GEG or efficiency house standard, the heating system with heat source and storage, the ventilation system as well as the number of electrical circuits. Blanket formulas like “according to EnEV/GEG” without a number are not a reliable standard - have the specific values entered.

Especially for the prefabricated house in timber construction airtightness is a central quality feature. Check whether a blower door test is agreed and which target value should apply. For the heating system the construction description should not just name “heat pump” but specify make, output, storage size and whether a photovoltaic system is planned or only prepared. These details can hardly be renegotiated later without additional costs arising:

  • U-values for external wall, roof, floor slab and windows - as specific numbers.
  • Achieved efficiency house standard (e.g. EH 55/40) instead of only “GEG-compliant”.
  • Heating system with make, output, storage and heating surfaces (underfloor heating).
  • Ventilation: controlled living space ventilation with heat recovery - yes/no.
  • Airtightness: blower door test agreed, target value specified.
  • Photovoltaics and storage: included, only prepared or not planned.
  • Electrical: number of sockets and circuits per room, pre-wiring for E-car.

How the execution of this technology is later controlled on the construction site is described in the guide Prefabricated house construction supervision. Because a good construction description is only useful if the company also implements the promised quality.

Have construction description checked independently

Short answer: Neutral bodies without provider ties take on an independent review of the construction description: Bauherren-Schutzbund and Verband Privater Bauherren offer technical construction description and contract reviews, publicly appointed and sworn building experts assess the scope of services professionally. Our portal does not arrange experts - we compare manufacturers and compare catalogues as well as offers.

An independent review is particularly valuable for the construction description because laypersons often overlook the decisive omissions: A missing trade is less noticeable than a poorly formulated paragraph. An experienced expert reads the description against a reference list of complete trades and marks exactly the places where later supplements are threatened. Expect around 250 to 800 Euro for a construction description review in 2026 - a small investment measured against additional claims in the five-digit range.

A professional review uncovers gaps, unclear formulations and missing quantity specifications before you sign. Neutral contact points are the Verband Privater Bauherren, the Bauherren-Schutzbund and the IHK expert directory. We cover an accompanying control of the entire construction in the guide Prefabricated house construction support, the quality check in detail under Prefabricated house quality control.

Checklist: Check prefabricated house construction description point by point

Short answer: Check the construction description in three steps: first the mandatory contents according to Art. 249 EGBGB, second the scope of services compared to other providers and third the typical gaps (earthworks, house connections, painting, floor coverings). What is not clearly described is not owed - in case of doubt inquire in writing and have it supplemented.

  • Mandatory contents according to Art. 249 EGBGB completely present.
  • Expansion stage clearly named (turnkey, technikfertig, shell house for self-finishing).
  • Wall structure, U-values, insulation thicknesses and energy standard specified.
  • Heating, ventilation, sanitary and electrical with makes and quantities.
  • Material selection budget per trade with price groups and quantities.
  • All “bauseits” and “optional” positions listed and quantified.
  • Binding information on the completion date included.
  • Independent review by VPB, BSB or expert before signing.

Once the construction description is checked and the contract signed, control of the execution follows. How you recognize and document defects early you can read in the guide Prefabricated house defect inspection and - for a legally secure handover - under Prefabricated house final acceptance.

Compare services first, then decide

A good construction description can only be recognized in comparison. Request several construction and performance descriptions via our free comparison and compare services and prices - neutral and non-binding.

What does your dream house really cost?

Request free matching offers from checked manufacturers and compare the square meter prices for your building project.

Now compare house prices

Important questions explained briefly

The most common price questions around prefabricated house construction description check - compactly answered by the editorial team of Modulhaus-Fertighaus (Stand 2026).

What must a prefabricated house construction description contain?
According to Article 249 EGBGB at least: a general description of the building with floor plan and living area, type and scope of services including expressly excluded services, building data and information on building construction and building physics, the interior fit-out and the house technology, the energy, fire protection and sound insulation standard as well as binding information on the time of completion.
How do I compare building descriptions from multiple providers?
Only with identical framework conditions: same living area, same energy standard, same fit-out stage. Create a table - trades in the rows, providers in the columns. This way you see immediately where a provider lists a position as included that another marks as 'bauseits' or 'optional'. Only this line-by-line comparison makes the final prices honestly comparable.
Which services are typically missing?
Most frequently missing are earthworks and floor slab, the house connections for power, water, wastewater and telecom as well as interior plaster, painting and floor works. Also exterior facilities, carport, construction power, surveying and soil report often fall outside the offer. Look specifically for the signal words 'bauseits', 'nicht enthalten', 'optional' and 'nach Aufwand'.
Does a detailed building description say something about the quality?
No. Article 249 EGBGB only requires that it be described - not how high-quality it is built. A provider meets the requirement even with a cost-effective standard as long as he describes it clearly. The building description is thus primarily a transparency promise, not a quality promise. Whether the standard fits your requirements you must judge for yourself position by position.
What does an independent building description review cost?
2026 usually around 250 to 800 euros, depending on the scope. Neutral contact points without provider binding are the Association of Private Builder-Owners (VPB), the Builder-Owners Protection Association (BSB) and publicly appointed, sworn building experts via the IHK directory. Measured against possible additional claims in the five-digit range, the review is a small investment.
TÜV Rheinland ZERTIFIZIERT – geprüfte Qualifikation, ID 0000038136

Personal qualification of our expert

Proven professional competence

At your side: the expert team of Modulhaus-Fertighaus

Your TÜV-certified expert around prefabricated house prices

  • TÜV Rheinland tested qualification
  • Manufacturer-independent support
  • Certified expert
Get to know the experts